Get in Touch

Course Outline

Introduction

Sequencing Overview

Sequencing Methods in App-V

  • Sequencing web-based applications
  • Creating a Virtual Environment for the application
  • Sequencing applications that hardcode installation paths to the C:\ drive
  • Performing an "Open for Package Upgrade" on existing packages
  • Embedding scripts into an .OSD file

Merging and Overriding

  • Overriding a local registry key
  • Merging with a local registry key
  • Overriding a local directory
  • Merging with a local directory

Microsoft Office in App-V

  • Understanding different Office versions
  • Creating an App-V Office package using the Office Deployment Tool
  • Steps for publishing the developed Office package
  • Customizing and managing App-V packages

Comparing VFS to PVAD

  • Utilizing the Primary Virtual Application Directory (PVAD) in sequencing
  • Differences between VFS and PVAD in a virtual environment
  • Accessing PVAD even when it is hidden from view

Deploying and Testing PowerShell

  • Downloading and installing App-V server components
  • Procedures for deploying PowerShell cmdlets
  • Standard steps for testing the deployed PowerShell environment

Understanding Run-Virtual in App-V

  • Adding a sub-key to the run-virtual configuration
  • Retrieving the AppvClientPackage PowerShell cmdlet
  • Using the /appvpid:<PID> command line switch
  • Utilizing the /appvve:<GUID> switch

Patches and Updates in App-V

  • Definition of patches and updates
  • Understanding Hotfix 8 for App-V 5.1
  • Applying Hotfix 8 for update purposes

Use of Scripts in App-V

  • Details on the script-launcher
  • Issues associated with App-V scripting solutions
  • Installing a script-launcher supporting environment
  • Overview of different script types

Automating Conversion to App-V

  • Evaluating the time required for conversion
  • Assessing the associated costs
  • Techniques for future conversion efforts

Accelerators in App-V Packages

  • Definition of package accelerators
  • Steps to create a package accelerator

Dynamic Configuration

  • Configuring user files
  • Configuring deployment files

Advanced Connection Groups

  • Function and location of the configuration group file
  • Layout of the connection group file
  • Configuring packages within a connection group
  • Virtually supported connection groups

Advanced Client Integration

  • Definition of client integration in App-V
  • Methods for achieving integration in App-V
  • Importance of client integration in App-V

Troubleshooting App-V

  • Avoiding common pitfalls
  • Integrating foundational, operational, and contextual knowledge
  • Using Process Monitor for troubleshooting
  • Troubleshooting the App-V client
  • Troubleshooting the OSD file

Client Debugging

  • Training customer care staff on App-V functions
  • Repairing a package
  • Cleaning up the connection group
  • Interpreting App-V client logs

Package Optimizers in App-V

  • Understanding package optimization
  • Strategies for space optimization
  • Strategies for performance optimization

Best Practices

Summary and Conclusion

Requirements

  • Previous experience in implementing Microsoft Application Virtualization

Target Audience

  • IT professionals responsible for managing desktop configurations and application deployments
  • IT specialists aiming to expand their expertise and skills in virtualization technologies
 21 Hours

Number of participants


Price per participant

Upcoming Courses

Related Categories